What we check. Every system, every checkpoint.

The complete inspection scope for Singapore handover defect inspections. Architectural, plumbing, electrical, structural, bomb shelter, plus condo and landed-specific additions.

Full scopeBTO · Condo · Landed~9 categories

The complete checklist

Every system, every surface, every checkpoint. This is what a PropDefect inspection covers across BTO, condo, EC, and landed properties. Items vary slightly by property type: landed adds roof, perimeter drainage, and pool systems; condos add smart home commissioning and curtain wall glazing.

Architectural & Finishing

  • Paintwork: runs, missed areas, surface defects, coverage consistency
  • Plaster & skim coat: cracks, surface uniformity, edge finishing
  • Tile work: every tile tap-tested for hollow bonding, alignment, edge condition, grouting
  • Cabinetry: door alignment, soft-close function, drawer slides, edge banding, hardware
  • Countertops: surface defects, alignment, sealing, edge finishing
  • Built-in fittings: wardrobes, vanities, kitchen islands, shelving
  • Doors & windows: alignment, sealing, lock function, weather-stripping, glazing

Plumbing

  • Water pressure: every tap tested cold and hot
  • Drainage rates: sink, shower, floor traps, drainage gradient verification
  • Leak detection: visible pipework under sinks, behind vanities, ceiling stains
  • Hot water supply: heater commissioning, time-to-hot verification, mixing valve function
  • Sanitary fittings: toilet flush mechanism, cistern leak, bidet/shower function
  • Floor trap function: drainage rate, anti-siphon, odour

Electrical

  • Every socket: polarity test (live, neutral, earth)
  • RCD trip test: verifies residual current device responds to leakage
  • Distribution board: labelling, accessibility, capacity adequacy
  • Lighting: every fixture, every switch tested
  • Ceiling fans: operation, balance, speed control
  • Air-conditioning: cold air output, condensate drainage, control unit function
  • Network points: connectivity verification on requested points

Structural

  • Wall cracks: measured, located, classified by severity (hairline / structural / settlement)
  • Ceiling cracks: same classification
  • Beam alignment: visible structural irregularities
  • Settlement evidence: door alignment shifts, tile edge separation, gap openings
  • Floor levelness: spot checks across rooms

Bomb Shelter (HDB & private)

  • Door seal: continuous seal verification on all four sides
  • Hinge alignment: smooth operation, no scraping
  • SCDF certification: valid stickers, current dates
  • Ventilation: air vents clear, fan operation if motorised
  • Interior surfaces: paint, sockets, no water marks or efflorescence

Air-Conditioning

  • Unit alignment: mounting, levelness, accessibility
  • Drainage: condensate pipe slope, no leaks, no pooling
  • Multi-zone systems (condo/landed): each zone tested independently
  • Outdoor unit placement: clearance, accessibility, condensate management
  • Control unit: remote function, scheduling, mode switching

Service Yard & Outdoor (where applicable)

  • Floor drainage: gradient verification, drainage rate
  • External taps: function, sealing, drainage
  • Outdoor electrical: weatherproof rating, RCD protection where required
  • Service door: alignment, sealing, weather resistance

Landed-Specific Additional Scope

  • Roof & roof-deck: tile alignment, flashing, drainage, accessibility
  • Perimeter drainage: site drainage, soakaways, storm drainage, scupper drains
  • Boundary walls: finishing, settlement, drainage gradient
  • Swimming pools: tile bonding underwater, balance tank, filtration, copings
  • Garages: drainage, door function, ventilation
  • Plumbing risers: vertical pipework, vent pipes, isolation valves
  • External plant: water tank, pump room, main switchboard if applicable

Condo-Specific Additional Scope

  • Smart home systems: door access, intercom, smart lighting commissioning
  • Premium tile/stone: bonding of large-format and imported slabs, where lippage and hollow spots are common
  • Balcony drainage: gradient, planter box waterproofing
  • Curtain wall glazing: sealing, alignment, tinting consistency
  • HVAC system: multi-zone commissioning, VRV systems where present
Note

This is what we check. What we find is a different conversation: the patterns of what consistently shows up across Singapore handovers, with photo examples and severity breakdowns.

What's NOT in our scope

Some things sit outside a defect inspection. PropDefect does not assess:

  • Land or boundary disputes: that's a licensed surveyor's role
  • Building plan compliance: that's a registered architect or professional engineer's submission
  • Major structural defects requiring intervention: we identify and refer to a structural engineer
  • Asbestos or hazardous materials: referred to a licensed hazardous-materials specialist
  • Pre-purchase property valuation: different scope, different profession

When something falls outside our scope, we tell you, note it in the report, and point you to the right specialist to follow up.